Upcoming Events

Mayo | Miscellaneous

no events match your query!

New Events


no events posted in last week

User Preferences

  • Language - en | ga
  • text size >>
  • make this your indymedia front page make this your indymedia front page

Blog Feeds

Irish Left Review
Joined up thinking for the Irish Left

offsite link New Books Worth Reading Mon Sep 19, 2016 23:25 | Seán Sheehan

offsite link 13 Billion ? Lucky for some? Mon Sep 05, 2016 13:04 | Tony Phillips

offsite link Rebuilding Ireland: Long on Promise, Short on Detail Mon Aug 29, 2016 22:20 | Eoin O'Mahony

offsite link Brexit and Other Issues: Comments on the Current Situation Mon Aug 29, 2016 21:52 | Brendan Young

offsite link Bin Charges: From Private Circus to Public Service Tue Jun 21, 2016 12:38 | Michael Taft

Irish Left Review >>

Spirit of Contradiction

offsite link Electoralism vs Abstentionism (Or: Why You Should Run For Office) Fri Aug 26, 2016 17:07 | Slyvia Smith

offsite link Centrism extremism: how horseshoe-politics silences brutality Sat Jul 02, 2016 18:25 | yeksmesh

offsite link Of Tankies, Trots and Social Democrats Thu May 12, 2016 23:41 | Gavin Mendel-Gleason

offsite link Avatars of the Advanced-Capitalist Psyche – Capitain America: Civil War Mon May 09, 2016 00:07 | Gavin Mendel-Gleason

offsite link Wailings about Left Unity Sat Feb 13, 2016 01:13 | James O'Brien

Spirit of Contradiction >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link Hell at the Gates: A propaganda exercise

offsite link Breaking: New minister for investigative judges to be appointed Anthony

offsite link Michael O’Regan: A ‘surface’ journalist Anthony

offsite link Brendan Howlin: A political leprechaun Anthony

offsite link Irish media should be fighting gagging law Anthony

Public Inquiry >>

NAMA Wine Lake

offsite link Farewell from NWL Sun May 19, 2013 14:00 | namawinelake

offsite link Happy 70th Birthday, Michael Sun May 19, 2013 14:00 | namawinelake

offsite link Of the Week? Sat May 18, 2013 00:02 | namawinelake

offsite link Noonan denies IBRC legal fees loan approval to Paddy McKillen was in breach of E... Fri May 17, 2013 14:23 | namawinelake

offsite link Gayle Killilea Dunne asks to be added as notice party in Sean Dunne?s bankruptcy Fri May 17, 2013 12:30 | namawinelake

NAMA Wine Lake >>

Shell's Tunnel Boring Machine parts delayed by lock-on

category mayo | miscellaneous | news report author Saturday October 13, 2012 00:19author by Shelver - RSC Report this post to the editors

First segments eventually delivered to tunnelling compound,11 segments to come

On Thursday night Shell's efforts to move parts of a Tunnel Boring Machine (TBM) critical to the Corrib gas project hit another delay as protesters blocked the main gate of the refinery site with a concrete lock-on.

Lock-on at Gate 1of refinery
Lock-on at Gate 1of refinery

Two protesters from the Rossport Solidarity Camp locked themselves into a 400kg reinforced concrete barrel from 7.30pm until the Garda protest removal team finished cutting them out at about midnight. By this stage about 20 people had gathered at the gates in support, but this was out-numbered by a force of about 50 to 60 Gardaí which was clearly already planned to mobilise to move the TBM.

For the hour or two before the Gardai cordoned off the area around the lock-on, campaigners chatted drinking tea and eating scones. It was satisfying to hear that as the lock on was being set up at Shell's main refinery gate, Gardaí were searching the ditches on the Aughoose road (where most of the recent lock-ons have happened).

After the lock-on had been dealt with the Gardaí swept up its remains to clear the way for the TBM parts, then proceeded to clear the section of road outside the refinery with the usual lawless pushing and shoving. After a delay of over 2 months since the first delivery was attempted, Shell and the Gardaí finally managed to deliver some of the TBM parts to the Aughoose tunnelling compound two miles away.

The two lock-on protesters were released from Belmullet Garda station at about 4am this morning each charged with sections 8&9 (obstruction and refusing to obey the directions of a Garda when suspected of committing a crime) of the public order act, and join 5 more campaigners due to appear in court in Belmullet on November 14th.

In a recent letter to local residents Shell have said that they intend to start tunnelling in the coming weeks, but it is thought that there are still 11 sections of the TBM yet to be delivered before they can begin. There are signs that delays will continue - without any help yet another lorry delivering TBM parts went off road earlier in the week outside Bangor - after making its delivery however.

After a lie in today we headed down to remove the windmill - last vestige of the summer camp 2012. The previous week had been a massive moving effort to clear out the field and pack the camp infrastructure away for the winter. The house up the hill at Barr na Coilleadh Pullathomas is now the main camp base again for the winter. Come visit and check out the view for yourself!

See rossportsolidaritycamp.org for info about staying at the camp,
email rossportsolidaritycamp@gmail.com or
ring 085 1141170 to let us know you're coming or for other info.

Related Link: http://www.shelltosea.com

Garda protest removal team tents
Garda protest removal team tents

exceptional convoy...
exceptional convoy...

View from Barr na Coilleadh
View from Barr na Coilleadh

author by CJpublication date Sat Oct 13, 2012 20:19Report this post to the editors

how ye managed another lock on right under their noses is beyond me, they must be really stupid. fair play, hope the guards weren't too rough after the lockon was cleared. keep it up.

author by Justin Morahanpublication date Sun Oct 14, 2012 17:06Report this post to the editors

Meanwhile Shell have been charged by local farmers in Nigeria and by Friends of the Earth with massive pollution

Related Link: http://www.voanews.com/content/shell-in-court-over-nige....html
author by seamus - of the peoplepublication date Tue Oct 30, 2012 18:15Report this post to the editors

Good to see that the tunnelling machine has finally made it's way to Aughoose. Time to get on with digging that big hole. Might find something useful on the way.

© 2001-2016 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy