Upcoming Events

Dublin | Environment

no events match your query!

User Preferences

  • Language - en | ga
  • text size >>
  • make this your indymedia front page make this your indymedia front page

Blog Feeds

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link Diarmaid Ferriter: Denial and the language of cute hoorism

offsite link Fianna Fail liars Anthony

offsite link RTE journalist Claire Byrne brings Fine Gael TD Alan Farrell to heel Anthony

offsite link Is the establishment media finally waking up to political corruption? Anthony

offsite link Bus strikers beat themselves up Anthony

Public Inquiry >>

The Saker
A bird's eye view of the vineyard

offsite link Why voting for Trump was the right thing to do (7 reasons) Fri Apr 21, 2017 21:42 | The Saker
This article was written for the Unz Review: http://www.unz.com/tsaker/vot... Now that Trump has already comprehensively betrayed all his campaign promises and that he 100 first days in office are marked by

offsite link Champs-Elysees attack: Perfect timing, for some Fri Apr 21, 2017 04:02 | The Saker
by Ramin Mazaheri On the night of April 21st I was in my office in Paris, just 100 meters from the Champs-Elysees, when I got a phone call from a

offsite link Background on USS Carl Vinson ? Saga by LeDahu Thu Apr 20, 2017 15:58 | Scott
Here’s a background info sheet: US Navy statement: “After departing Singapore on April 8 and cancelling a scheduled port visit to Perth, the Strike Group was able to complete a

offsite link Ramzan Kadyrov on Western Intelligence services provocations Thu Apr 20, 2017 15:34 | Scott
Russia: EXCLUSIVE Western intelligence did ‘everything possible to destroy’ Russia – Kadyrov     Apr 19, 2017 “Western and European intelligence agencies have done everything possible to destroy the sovereign

offsite link Kadyrov: West will use every resource to bring Russia to her knees Thu Apr 20, 2017 04:45 | The Saker
RT reports: The US and its Western allies will use any opportunity to harm Russia, Chechen leader Ramzan Kadyrov told RT. He believes the rise of terrorism in Syria was

The Saker >>

Human Rights in Ireland
www.humanrights.ie

offsite link Why would any country put abortion in the Constitution? Thu Apr 20, 2017 17:28 | Máiréad Enright

offsite link Northern/Ireland After Brexit: Exploring the Human Rights Impact Tue Apr 18, 2017 15:06 | Liam Thornton

offsite link Call for Applications: Challenges to International Criminal Justice Summer Academy Northumbria Unive... Tue Apr 11, 2017 19:20 | Charles O'Mahony

offsite link #Strike4Repeal: Strike Against the Citizens? Assembly? Wed Mar 08, 2017 07:51 | Máiréad Enright

offsite link Reflections on the Citizen?s Assembly (4): The Presentation of Dr. Dónal O?Mathúna Sun Feb 26, 2017 20:19 | GuestPost

Human Rights in Ireland >>

Cedar Lounge
For lefties too stubborn to quit

offsite link Another UK Poll 09:31 Sun Apr 23, 2017 | WorldbyStorm

offsite link Babylon 5 redux 12:57 Sat Apr 22, 2017 | WorldbyStorm

offsite link The Citizens? Assembly speaks 12:53 Sat Apr 22, 2017 | WorldbyStorm

offsite link Speaking of the Lord of the Rings yet again? 12:04 Sat Apr 22, 2017 | WorldbyStorm

offsite link This Weekend I?ll Mostly Be Listening to? Industries of the Blind 07:02 Sat Apr 22, 2017 | irishelectionliterature

Cedar Lounge >>

Marlborough Street bridge plan looks increasingly absurd amid decimated city centre traffic levels

category dublin | environment | opinion/analysis author Tuesday January 24, 2012 11:32author by Vincent Byrne Report this post to the editors

Dublin is still reeling from its boom period and the cacophony of high-flown plans it threw up. Now that it's all over, how do the various projects stand up?

Overhead view of Dublin City Council’s planned “public transport priority” bridge at Marlborough Street – Hawkins Street.
Overhead view of Dublin City Council’s planned “public transport priority” bridge at Marlborough Street – Hawkins Street.


Dublin is still reeling from its boom period and the cacophony of high-flown plans it threw up. Now that it's all over, how do the various projects stand up?

One boom-era plan that seems set to proceed is Dublin City Council's building of a “public transport priority” bridge over the Liffey between Marlborough Street and Hawkins Street.

Conceived as a relief bridge while Metro North was under construction at adjacent O’Connell Bridge, it would later accommodate a southbound line of the city-centre Luas link, plus buses and taxis.

Metro North is more or less cancelled, and the Luas link, while pencilled in to proceed in 2015, has yet to secure funding of an estimated €170 million.

The location of the new bridge so close to O’Connell Bridge was always problematic, but it was accepted by city stakeholders in the context of plansat the time, and passed through the planning system with little or no objection.

But now, with the dramatic decline in city-centre traffic levels over the past three or four years, and changes to other plans, the Marlborough Street – Hawkins Street bridge is becoming an increasingly absurd idea.

It will effectively provide a broad new multi-lane road bridge a few metres to the east of the widest bridge in the country and one of the widest of its kind in the world.

The bridge has no real circulation gain, as it simply leaves and enters the same traffic circulation system that already exists in the area, serving only to bypass O’Connell Bridge.

Nor is the bridge needed by Luas - the wide streets handed down to us by the Georgian planners of the 18th century give ample space along O'Connell Street and Westmoreland Street for a Luas line travelling in eachdirection, plus vehicle, cycle lane and footpath space.

When and if the Luas link eventually comes to be constructed, the obvious route to take (and despite the results of ‘route selection’ processes) is that of the original alignment with both directions running along O’Connell Street, O’Connell Bridge and Westmoreland Street, not least for the reduced costs of keeping the two lines together.

The city centre streets and bridges are the product of the great period of classical urban planning in the 18th century. Bridges on the Liffey were built at a consistent distance from each other, and the river and streets led to views of carefully positioned setpiece buildings.

The regular spacing of bridges along the Liffey was observed for hundreds of years, until 2003 when James Joyce Bridge was built in-between two older bridges near Queen Street. The disorienting, incoherent effect of bridges built close to one another here is plain for all to see.

James Joyce Bridge makes no sense in its location, although it was in fact a legacy of Dublin Corporation's insane 1960s road plans for central Dublin and should arguably have been shelved when the body of those plans were shelved in the 1980s.

Likewise, combined factors today including the recession, the opening of the Samuel Beckett relief bridge in the docklands and the huge increase in the popularity of cycling arising from the Cycle to Work and bike rental schemes have radically changed traffic conditions in the centre over past the past couple of years, and future plans provide for further reduction of traffic.

The justification for the Marlborough Street – Hawkins Street bridge is now extremely shaky and we should face up to it. It is a product of the distorted, addled period that was the economic boom in Dublin, and its unprecedented pressures.

The minor circulation gain in linking Marlborough Street and Hawkins Street will be massively outweighed by its impact on the plan of one of Europe’s great classical cities.

Proceeding with the bridge now will repeat the town-planning mistake of James Joyce Bridge on a grand scale and will leave another stain on the record of Dublin City Council.

It is not too late to reconsider. The site has been hoarded off since the New Year but no construction work has begun. A review of the bridge should now be undertaken by the government.

author by Mr Dubliner - The Dublinerspublication date Wed Jan 25, 2012 19:05Report this post to the editors

Good story. That bridge looks cat, ye think it fell out of the sky, all most as daft a plan that unfolded a few years ago to run a GIANT cable car system above the Liffey.

Once again traffic is given priority, they'll never learn.

Have ye heard any more about the plans to level Moore Street ?

 
© 2001-2017 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy